Preliminary issue paper : the proposed addition of hydropower units and a reregulation facility to the Corps of Engineers'' Libby Dam Project in Lincoln County, Montana.
  • Date de publication: [1978]
  • Éditeur(s): Montana Dept. of Natural Resources and Conservation
  • Contributeur(s): Biodiversity Heritage Library
  • Collection(s): Biodiversity Heritage Library
  • Catégorie: Social sciences
  • Le sujet(s): Libby Dam (Mont.) ,  Hydroelectric power plants--Montana--Lincoln County. ,  Hydroelectric power plants--Environmental aspects--Montana--Lincoln County. ,  Electric power production--Montana--Lincoln County. ,  Water-power--Montana--Lincoln County. ,  Fishes--Effect of dams on--Montana--Lincoln County.
  • CallNumber: 333.914N7pah 1978
  • mots-clés: Hydroelectric power plants Montana Lincoln County. Hydroelectric power plants Environmental aspects Montana Lincoln County. Electric power production Montana Lincoln County. Water-power Montana Lincoln County. Fishes Effect of dams on Montana Lincoln County. Libby Dam (Mont.)

Enregistrer dans une liste


Autres versions de l'éditeur